Chief Engineer, Distribution Office, KPDCL reported that 33 kv Gis Tengpora Grid Exhibition Tapeline (Allchibagh Bund Part), 33 KV GIS TENGPORA KP BAGH Line and 33 KV TRC Rajbagh Line/ KP Bagh Rajbagh Line (sr. 07, 07 and 09).
In addition, the shutdown approved for the 33 KV Pampor Badambag Line (Senior Number 14) on 20 May 2025 can also be canceled to facilitate the smooth operation of the PSES tunner due to 18 and 19 May 19th May, which is affected due to power supply due to May 2025 of May 2025.